www.hz-muhammed.net Homepage
   
- Sadece  ve Sadece Peygamber Efendimiz (s.a.v) Hakkında Konu Paylaşılmasına İzin Verilecektir.
- Kul Hakkını ve Telif Yasasını İhlal Edici İçerik Eklenmesi Yasaktır.
KUTLU DOĞUM AYI GELDİ.
Şimdi SLAVAT ve HATİM lerimizle; PEYGAMBER EFENDİMİZ'e VEFA ZAMANI
  2009 (Okunan) 2010 (Okunan)   2011 (Hedef) 2011 (Okunan) 2011 (Kalan)
Salavat 1.268.640 1.247.200   1.000.000 80.000  
Hatim 4 Hatim 6 Hatim   5 1. Hatim  
2011 Yılı Kutlu Doğum Ayı HATİM Kampanyamıza Katılır mısınız ?

2011 Yılı Kutlu Doğum Ayı SALAVAT Kampanyamıza Katılır mısınız ?

Forum Home Forum Home > EFENDİMİZ HZ.MUHAMMED (S.A.V) > Efendimiz Hz. Muhammed'in Hadis-i Şerifleri
  New Posts New Posts RSS Feed - Preheating pit repair means
  FAQ FAQ  Forum Search   Register Register  Login Login

Preheating pit repair means

 Post Reply Post Reply
Author
Message
quangongzi View Drop Down
Üye
Üye


Joined: Ekim 18 2016
Status: Offline
Points: 86
Post Options Post Options   Thanks (0) Thanks(0)   Quote quangongzi Quote  Post ReplyReply Direct Link To This Post Topic: Preheating pit repair means
    Posted: Mart 06 2017 at 14:40
Preheating pit repair technology is mainly through the hot wall of the heating wall on the pavement of the heat treatment, so that part of the structure of the pit to achieve thermal regeneration after the filling and pushing the new material, the late rolling process and The traffic effect of molding is mainly in this process is effectively guaranteed, so we should attach great importance to the improvement of preheating technology to ensure that the equipment under certain cost control to achieve the specific function of the rational development. For different season changes in the maintenance of equipment to ensure the simplicity of the operating mode, while maintenance time should not be too long, but to put an end to the phenomenon of recurrence after repair, need to consider the direct filling of asphalt mixture and the use of cold feed, However, for the effective use of the above technologies and equipment, according to different construction requirements and the actual situation of the road, the emergency treatment of the above-mentioned technologies and equipment can be carried out according to different construction requirements and the actual situation of the road. The situation of a reasonable choice, package under the national urbanization under the construction of traffic road construction to further improve the level of development.Double Steel Roller - Road Machinery Equipment Manufacturers - Doan Machinery

In addition to repairing the quality of road pit repair has a certain dependence on the performance of the material, but also a certain level of technical facilities to support the quality of the work of the effective complement, specifically for the actual requirements of the actual conservation work for different levels of reasonable selection and cooperation , To ensure the quality of repair at the same time, to achieve low cost of investment and economic benefits to ensure the further implementation of sustainable development strategies to promote the transport industry as the representative of the various socio-economic level.

Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 10.17
Copyright ©2001-2013 Web Wiz Ltd.