www.hz-muhammed.net Homepage
   
- Sadece  ve Sadece Peygamber Efendimiz (s.a.v) Hakkında Konu Paylaşılmasına İzin Verilecektir.
- Kul Hakkını ve Telif Yasasını İhlal Edici İçerik Eklenmesi Yasaktır.
KUTLU DOĞUM AYI GELDİ.
Şimdi SLAVAT ve HATİM lerimizle; PEYGAMBER EFENDİMİZ'e VEFA ZAMANI
  2009 (Okunan) 2010 (Okunan)   2011 (Hedef) 2011 (Okunan) 2011 (Kalan)
Salavat 1.268.640 1.247.200   1.000.000 80.000  
Hatim 4 Hatim 6 Hatim   5 1. Hatim  
2011 Yılı Kutlu Doğum Ayı HATİM Kampanyamıza Katılır mısınız ?

2011 Yılı Kutlu Doğum Ayı SALAVAT Kampanyamıza Katılır mısınız ?

Forum Home Forum Home > EFENDİMİZ HZ.MUHAMMED (S.A.V) > Efendimiz Hz. Muhammed'in Hadis-i Şerifleri
  New Posts New Posts RSS Feed - Machinery and equipment maintenance work
  FAQ FAQ  Forum Search   Register Register  Login Login

Machinery and equipment maintenance work

 Post Reply Post Reply
Author
Message
quangongzi View Drop Down
Üye
Üye


Joined: Ekim 18 2016
Status: Offline
Points: 86
Post Options Post Options   Thanks (0) Thanks(0)   Quote quangongzi Quote  Post ReplyReply Direct Link To This Post Topic: Machinery and equipment maintenance work
    Posted: Şubat 27 2017 at 14:57
In the form of responsibility area to carry out "charter activities." According to the production positions and maintenance personnel with the situation of the responsibility area, set up by the "machine, electricity, equipment, gymnastics," the composition of the charter team. Carried out the "package one, two maintenance", "package inspection", "package leakage", "package hidden rectification", "package management" and "five packs" for the contents of the package unit activities. As the charter crew clear responsibilities, the standard clear, so that one, two maintenance and small package units.
Carry out equipment failure state detection and analysis activities to ensure the technical quality of equipment.Double Steel Roller - Road Machinery Equipment Manufacturers - Doan Machinery

Equipment failure rate is to reflect the technical quality of equipment is an important indicator of good quality, but also reflects the quality of equipment maintenance. Therefore, we have carried out the equipment fault state detection activities in the firing, making, raw material and electric instrument workshop, and set up the equipment fault state detection team composed of workshop leader, technical personnel, experienced maintenance and operation personnel, Operation and equipment failure status analysis and development of processing plans. At the same time, the mobile department established the company equipment failure state analysis group. Responsible for the company's professional equipment and more difficult equipment analysis and processing, and achieved good results, and effectively improve the equipment technology. Third, grasp the "three four seized" to reduce equipment failure.
"Three" is the company, workshop, team on the equipment of the three levels of inspection. Four seized the company is the Ministry of the Ministry of the monthly inspection; workshop weekly inspection; equipment professional management and maintenance workers on the day inspection; post operation of the staff check. In the "three four seized", the Department of the professional management staff to the scene every day, the workshop equipment management and maintenance of the daily inspection and maintenance of equipment inspection and supervision, and guide employees to follow the rules and strictly enforce the operating procedures The Equipment management personnel and maintenance personnel in the inspection, to take the body of the senses on the operation of the equipment "listen, touch, check, see, smell" to check the key parts. With "to see its table, the concept of its type, smell its taste, listen to the sound, the sense of its temperature" approach to determine and analyze the equipment failure.

Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 10.17
Copyright ©2001-2013 Web Wiz Ltd.