www.hz-muhammed.net Homepage
   
- Sadece  ve Sadece Peygamber Efendimiz (s.a.v) Hakkında Konu Paylaşılmasına İzin Verilecektir.
- Kul Hakkını ve Telif Yasasını İhlal Edici İçerik Eklenmesi Yasaktır.
KUTLU DOĞUM AYI GELDİ.
Şimdi SLAVAT ve HATİM lerimizle; PEYGAMBER EFENDİMİZ'e VEFA ZAMANI
  2009 (Okunan) 2010 (Okunan)   2011 (Hedef) 2011 (Okunan) 2011 (Kalan)
Salavat 1.268.640 1.247.200   1.000.000 80.000  
Hatim 4 Hatim 6 Hatim   5 1. Hatim  
2011 Yılı Kutlu Doğum Ayı HATİM Kampanyamıza Katılır mısınız ?

2011 Yılı Kutlu Doğum Ayı SALAVAT Kampanyamıza Katılır mısınız ?

Forum Home Forum Home > EFENDİMİZ HZ.MUHAMMED (S.A.V) > Efendimiz Hz. Muhammed'in Hadis-i Şerifleri
  New Posts New Posts RSS Feed - Maintenance of paver
  FAQ FAQ  Forum Search   Register Register  Login Login

Maintenance of paver

 Post Reply Post Reply
Author
Message
quangongzi View Drop Down
Üye
Üye


Joined: Ekim 18 2016
Status: Offline
Points: 86
Post Options Post Options   Thanks (0) Thanks(0)   Quote quangongzi Quote  Post ReplyReply Direct Link To This Post Topic: Maintenance of paver
    Posted: Aralık 01 2016 at 13:54
Maintenance work of the paver is usually carried out in the repair shop, but in the construction process if the damage occurred parts, only in the construction site maintenance operations. Whether in the repair shop or at the construction site for maintenance operations, cleaning is the most important, must ensure that the replacement or repair parts clean, to ensure the quality of maintenance and use of results.Small Road Roller - Shanghai Doan Machinery Technology Co.,Ltd

Electrical system maintenance
Electrical system parts and mechanical parts are different, the general failure occurs instantly without any precursor, electrical system failure will pavement construction will bring a series of negative effects. Because of its accidental failure, so the maintenance of electrical systems are generally carried out at the construction site, the maintenance of electrical systems in general to replace the new parts. In the replacement of new parts should be checked before the line is damaged, the connector is loose or too dirty and poor contact, so as to avoid unnecessary waste.
Maintenance of vibrators
Vibrators due to poor working conditions, coupled with this part of the lubrication is carried out by hand, from time to time there are missed butter or not playing into the phenomenon of no timely treatment. Damage to the main vibrator damage to the main bearing and rammer wear. Maintenance is generally replaced parts. If the hammer wear is more serious, and sometimes can not get new parts, tight schedule and circumstances, can be surfacing and then polished smooth, after such treatment can continue to use for some time.

Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 10.17
Copyright ©2001-2013 Web Wiz Ltd.